WIS 32 resurfacing work zone from Trinity Church Road through the village of Suring to County AA in the town of Breed. Bridge deck replacement at the WIS 32 bridge over the south branch of the Oconto River north of County M in Suring. This week, the bridge contractor will complete the removal of the existing deck at the South Branch Oconto River bridge. They will then set concrete forms to prepare for pouring the new deck. Saw cutters will complete the saw cuts for culvert pipe replacements. Landscaping crews will install erosion control measures at culvert pipe replacement and grading locations. WIS 32 is closed and detoured for the bridge deck replacement between Willow Road and Hill Road. There is a hard closure on the bridge. Vehicles may not cross. They will maintain access to businesses and properties in the work zone.
.